Tailgate V8: shell – F44 (new systems)
- Date: 2017 to 2018
- Contracting entity: Emil Bucher GmbH
- End customer/site of installation: BMW Leipzig
Project description:
- Entire electric planning (hardware construction, software project planning)
- Control cabinet construction
- Provision of control technology
- Assembly and installation
- Robot programming
- Commissioning
Technologies (excerpt):
2 pieces S7-1500 with CPU 1518F – PN/DP | 4 pieces visualization with WinCC on PC 677 | 5 pieces control units with WinCC visualization | 20 pieces FANUC industrial robots