Front end V8: shell – G22_G23 (new systems)

  • Datum: 2018 to 2019
  • Contracting entity: Emil Bucher GmbH
  • End customer/site of installation: BMW Dingolfing

Plants such as:

ZB left wheel housing | ZB right wheel housing | ZB front wall | Entire front end

Project description:

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction
  • Provision of control technology
  • Assembly and installation
  • Robot programming
  • Commissioning

Technologies (excerpt):

9 pieces S7-1500 with CPU 1518F – PN/DP | 9 pieces visualization with WinCC on PC 677D | 18 pieces visualization with WinCC on PC 477E | 14 pieces application PC677D | 35 pieces control units with WinCC visualization | 102 pieces KUKA KR C2/C4 industrial robots