Front end V8: shell – G22_G23 (new systems)
- Datum: 2018 to 2019
- Contracting entity: Emil Bucher GmbH
- End customer/site of installation: BMW Dingolfing
Plants such as:
ZB left wheel housing | ZB right wheel housing | ZB front wall | Entire front end
Project description:
- Entire electric planning (hardware construction, software project planning)
- Control cabinet construction
- Provision of control technology
- Assembly and installation
- Robot programming
- Commissioning
Technologies (excerpt):
9 pieces S7-1500 with CPU 1518F – PN/DP | 9 pieces visualization with WinCC on PC 677D | 18 pieces visualization with WinCC on PC 477E | 14 pieces application PC677D | 35 pieces control units with WinCC visualization | 102 pieces KUKA KR C2/C4 industrial robots