Skip to main content

Tailgate V8: Shell – F44 (New Systems)

  • Datum: 2017 to 2018
  • Contracting entity: Emil Bucher GmbH
  • End customer/site of installation: BMW Leipzig

Project description:

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction
  • Provision of control technology
  • Assembly and installation
  • Robot programming
  • Commissioning

Technologies (excerpt):

  • 2 pieces S7-1500 with CPU 1518F – PN/DP
  • 4 pieces visualization with WinCC on PC 677
  • 5 pieces control units with WinCC visualization
  • 20 pieces FANUC industrial robots