TKB2 V8: shell – I20 (new systems)
Date: 2019 to 2020
Contracting entity: BMW – plant engineering
End customer/site of installation: BMW Dingolfing
Project description:
- Entire electric planning (hardware construction, software project planning)
- Control cabinet construction
- Provision of control technology
- Assembly and installation
- Robot programming
- Virtual commissioning, physical system start-up
Technologies (excerpt):
5 pieces S7-1500 with CPU 1518F – PN/DP | 5 pieces visualization with WinCC on PC 677 | 9 pieces visualization with WinCC on PC 477E | 24 pieces control units with WinCC visualization | 39 pieces KUKA IR C5 industrial robots