TKB2 V8: shell – I20 (new systems)

Date: 2019 to 2020
Contracting entity: BMW – plant engineering
End customer/site of installation: BMW Dingolfing

Project description:

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction 
  • Provision of control technology
  • Assembly and installation 
  • Robot programming 
  • Virtual commissioning, physical system start-up

Technologies (excerpt):

5 pieces S7-1500 with CPU 1518F – PN/DP | 5 pieces visualization with WinCC on PC 677 | 9 pieces visualization with WinCC on PC 477E | 24 pieces control units with WinCC visualization | 39 pieces KUKA IR C5 industrial robots