Date: 2019 to 2021
Contracting entity: BMW – plant engineering
End customer/site of installation: BMW Leipzig

Project description:

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction 
  • Provision of control technology
  • Assembly and installation 
  • Robot programming 
  • Commissioning

Technologies (excerpt):

8 pieces S7-1500 with CPU 1518F – PN/DP | 8 pieces visualization with WinCC on PC 677 | 22 pieces control units with WinCC visualization | 53 pieces FANUC industrial robots

The scope also comprises the complete BestFit system, including hardware, software, engineering, and commissioning.