Body rear end V8: shell – G26BEV (new systems)
Date: 2019 to 2022
Contracting entity: BMW – plant engineering
End customer/site of installation: BMW Munich
Project description:
- Entire electric planning (hardware construction, software project planning)
- Control cabinet construction
- Provision of control technology
- Assembly and installation
- Robot programming
- Virtual commissioning, physical system start-up
Technologies (excerpt):
14 pieces S7-1500 with CPU 1518F – PN/DP | 14 pieces visualization with WinCC on PC 677 | 33 pieces visualization with WinCC on PC 477E | 15 pieces control units with WinCC visualization | 130 pieces ABB IRC5 industrial robots