Body rear end V8: shell – G26BEV (new systems)

Date: 2019 to 2022
Contracting entity: BMW – plant engineering
End customer/site of installation: BMW Munich

Project description:

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction 
  • Provision of control technology
  • Assembly and installation 
  • Robot programming 
  • Virtual commissioning, physical system start-up

Technologies (excerpt):

14 pieces S7-1500 with CPU 1518F – PN/DP | 14 pieces visualization with WinCC on PC 677 | 33 pieces visualization with WinCC on PC 477E | 15 pieces control units with WinCC visualization | 130 pieces ABB IRC5 industrial robots