BMW FIZ – Data Center Monitoring
Date: ongoing
Contracting entity: ERS-Elektrotechnik
End customer/site of installation: BMW FIZ
Project description:
We are continuously maintaining, expanding, and adjusting the existing monitoring control systems. These are used for the permanent monitoring of different measuring signals (temporary I/Os, currents). To record the signals, various PLC control systems are used, which collect and evaluate the measured values. The control systems are centrally visualized via a WinCC system, and an ACC system provides an operating status display and error alarm. In addition, energy meters are evaluated. Recirculating air-cooling units are centrally controlled for each smoke section. The control serves to provide the IT equipment with constant cooling, with the goal of using as little energy as possible.
Technologies (excerpt):
- ~40 pieces Siemens S7-300 control systems in different designs
- 1 piece Comfort Panel TP2200 as central visualization for energy measuring
- ~10 pieces Touch Panels TP177B/A
- WinCC Advanced V17
- WinCC flexible 2008
- Step 7 V5.5
- WinCC V7.x