TKB2 V8: Shell – I20 (New Systems)
Date: 2019 to 2020
Contracting entity: BMW Plant Construction
End customer/site of installation: BMW Dingolfing
Project description:
- Entire electric planning (hardware construction, software project planning)
- Control cabinet construction
- Provision of control technology
- Assembly and installation
- Robot programming
- Virtual commissioning, physical system start-up
Technologies (excerpt):
- 5 pieces S7-1500 with CPU 1518F – PN/DP
- 5 pieces Visualization with WinCC on PC 677
- 9 pieces Visualization with WinCC on PC 477E
- 24 pieces Control units with WinCC visualization
- 39 pieces KUKA KRC4 industrial robots