Finish V8: Shell – U06, U06PHEV (New Systems and Integration)
Date: 2019 to 2021
Contracting entity: BMW Plant Construction
End customer/site of installation: BMW Leipzig
Project description:
- Entire electric planning (hardware construction, software project planning)
- Control cabinet construction
- Provision of control technology
- Assembly and installation
- Robot programming
- Commissioning
Technologies (excerpt):
- 8 pieces S7-1500 with CPU 1518F – PN/DP
- 8 pieces Visualization with WinCC on PC 677
- 22 pieces Control units with WinCC visualization
- 53 pieces FANUC industrial robots
The scope also comprises the complete BestFit system, including hardware, software, engineering, and commissioning