Skip to main content

Energy module GEN6 GSC: technology EM – NCAR (new installations)

Date: 2023 to 2026
Contracting entity: BMW – plant engineering
End customer/site of installation: BMW Hungary (W15)

Project description:

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction 
  • Provision of control technology
  • Assembly and installation 
  • Robot programming
  • Process control of the conveyor systems connecting the plants
  • Virtual commissioning, physical system start-up

Technologies (excerpt):

55 pieces S7-1500 with CPU 1518F – PN/DP | 55 OC visualizations with WinCC Unified on Beckhoff CP3224 | 182 on-site visualizations with WinCC Unified via OP (operation panel), OS (operation HMI server), and OA (operation applications) on Beckhoff CP3224 | 209 KUKA KRC5 industrial robots | 817 drives for roller conveyors/longitudinal conveyors for pallets | 180 rotary tables | 176 drives for cell transport conveyors | 66 eccentric lift tables or scissor lift tables