Distribution facility for Munich West sewage duct

Date: 2025
Contracting entity: Urban drainage works Munich

Project description:

The distribution facility regulates the flow of wastewater from western Munich to the sewage treatment plants Munich North and Munich Gut Marienhof. Thanks to the new digital data connection, signals for controlling the valves as well as the feedback are transmitted in real time between the distribution facility and the control center. We supplied, installed, and programmed the control technology and carried out the commissioning. 

Technologies (excerpt):

PROFINET valve controls | CPU S7-1512F | Visualization Simatic PC 477 | TIA V20 | WinCC Advanced