Body Carcass and Side Frame V8: Shell – G60, G61, G90, G99, G32 (New Systems and Integration)
Date: 2019 to 2024
Contracting entity: BMW Plant Construction
End customer/site of installation: BMW Dingolfing
Plants such as:
- G60 – KG1, KG2, KG3, KG-AS, HFR, WL
- G60 – side frame inside, middle, outside
- G61 – KG1, KG2, KG3, KG-AS, HFR, WL
- G61 – side frame inside, middle, outside
- G32 – side frame inside, middle, outside
- G6x – roof system
Project description:
- Entire electric planning (hardware construction, software project planning)
- Control cabinet construction
- Provision of control technology
- Assembly and installation
- Robot programming
- Virtual commissioning, physical system start-up
Technologies (excerpt):
- 40 pieces S7-1500 with CPU 1518F – PN/DP
- 40 pieces Visualization with WinCC on PC 677
- 80 pieces Visualization with WinCC on PC 477E
- 100 pieces Control units with WinCC visualization
- 244 pieces KUKA KRC4 industrial robots … in the body carcass range
- 156 pieces KUKA KRC4 industrial robots … in the side frame range