Skip to main content

Body Carcass and Side Frame V8: Shell – G60, G61, G90, G99, G32 (New Systems and Integration)

Date: 2019 to 2024
Contracting entity: BMW Plant Construction
End customer/site of installation:  BMW  Dingolfing

Plants such as:

  • G60 – KG1, KG2, KG3, KG-AS, HFR, WL
  • G60 – side frame inside, middle, outside
  • G61 – KG1, KG2, KG3, KG-AS, HFR, WL
  • G61 – side frame inside, middle, outside
  • G32 – side frame inside, middle, outside
  • G6x – roof system

Project description:

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction 
  • Provision of control technology
  • Assembly and installation 
  • Robot programming 
  • Virtual commissioning, physical system start-up

Technologies (excerpt):

  • 40 pieces S7-1500 with CPU 1518F – PN/DP
  • 40 pieces Visualization with WinCC on PC 677
  • 80 pieces Visualization with WinCC on PC 477E
  • 100 pieces Control units with WinCC visualization
  • 244 pieces KUKA KRC4 industrial robots … in the body carcass range
  • 156 pieces KUKA KRC4 industrial robots … in the side frame range