Skip to main content

Control of lighting and blinds (BMW FIZ)

Date: ongoing
Contracting entity: BMW Group
End customer/site of installation: BMW Group Research & Innovation Centre (FIZ)

Project description:

We are continuously renovating, maintaining, and expanding the existing lighting and blind control systems and adapting them to current requirements. A central control system bundles the building management technology in the control center so that all external systems are supplied with commands and monitored. A visualization allows for carrying out switch-on and switch-off commands, which can be adjusted individually per building/floor if required.

Technologies (excerpt):

>50pieces Siemens S7-300 controllers | >300pieces WAGO I/O PROFIBUS connections 750-xxx | ≈10pieces Vipa small controllers 200V series | 2pieces Siemens 319F/1516F | 1Comfort Panel TP2200 | ≈30pieces TP177B/A touch panels | >200pieces WAGO controllers | KNX controllers | WinCC Advanced V17 | TIA V17 | WinCC flexible 2008 | Step7 V5. 5 | WAGO lighting management software | WAGO core distributor software | KNX ETS5