Skip to main content

Control of lighting and blinds (BMW FIZ)

Date: ongoing
Contracting entity: BMW Group
End customer/site of installation: BMW Group Research & Innovation Centre (FIZ)

Project description:

We are continuously renovating, maintaining, and expanding the existing lighting and blind control systems and adapting them to current requirements. A central control system bundles the building management technology in the control center so that all external systems are supplied with commands and monitored. A visualization allows for carrying out switch-on and switch-off commands, which can be adjusted individually per building/floor if required.

Technologies (excerpt):

> 50 pieces Siemens S7-300 controllers | > 300 pieces WAGO I/O PROFIBUS connections 750-xxx | ≈ 10 pieces Vipa small controllers 200V series | 2 pieces Siemens 319F/1516F | 1 Comfort Panel TP2200 | ≈ 30 pieces TP177B/A touch panels | > 200 pieces WAGO controllers | KNX controllers | WinCC Advanced V17 | TIA V17 | WinCC flexible 2008 | Step 7 V5. 5 | WAGO lighting management software | WAGO core distributor software | KNX ETS5